Case Study: A1 North Dene Footbridge

Client :
Nusteel Structures Ltd
Location :
Hythe, Kent
Date :
January 2017
Products :
Stirling Lloyd Bridgemaster Combined Anti-slip and Waterproofing System

Route One Highways were employed by Nusteel Structures to carry out the Bridgemaster specified on North Dene footbridge.

Route One operatives installed Stirling Lloyd’s Bridgemaster System, the 3 in 1 combined waterproofing, wearing course and high friction surfacing to the footbridge at Nusteel’s premises in Kent.

Nusteel prepared and primed the bridge deck prior to Route One’s arrival. Deck preparation is carried out in order to achieve an SA2.5 finish which prepares the steel deck for the primer. Then using Stirling Lloyd’s ZedS94 anti corrosive metal primer, the steelwork is protected from corrosion and this also enhances the bond between the Bridgemaster and the deck.

The system chosen was 6mm thick with a 1-3mm Guyanan Bauxite aggregate dressing.

As the works were completed in an enclosed workshop, Route One operatives were able to install the Bridgemaster over 2No days with no interruptions or weather issues, resulting in a timely completion of the project.

 

sector-img1

• Stirling Lloyd’s Bridgemaster System

• Skid resistant and waterproof

• Flexible, durable, economical solution

 

sector-img2

For more information about this and other Route One projects, call our team on:            01977 799999

  • CL Gold

    Route One Goes For Gold!

    05 Apr 2018

    Route One Infrastructure is delighted to announce that we have upgraded our Constructionline Membership to Gold!

    Read More
  • Catthorpe-interchange-new-finished-Mar-17

    Route One Highways & The Major Midlands Junction Improvement

    05 Apr 2017

    Route One Highways were employed in 2014 by Skanska to complete the Waterproofing and Expansion Joint works to the £191 million new interchange.

    Read More
  • 0006 (2)

    Route One Goes Paperless

    07 Mar 2017

    As part of our business improvement plan, Route One has purchased portable computers in the form of Samsung Galaxy Tablets. These have been installed with SmartSite by Sasets.com; a software created by Microsoft’s top mobile application designers.

    Read More

"From the initial communications to the delivery on site, they have been very supportive and soon became part of the AMCO site family team."

K Jones

Find out how Route One can help with your project now. Call us on...

01977 799999