Route One attended site to carry out emergency repairs, one day after receiving the call.

A One+ Structures Supervisor made the call and within the same day Route One Contracts Manager, Andy Evans, was on site to make an assessment. A crew was mobilised and attended site the following evening.

Route One excavated the defective area then cleaned, primed and reinstated with Stirling Lloyd Nosing Mortar. The newly installed mortar was then covered with Safetrack HW and a 1-3mm aggregate to create an Anti-Slip Surface.

Due to Route One’s rapid response, minimal time was spent on site, resulting in minimal disruption to road users.

sector-img1
  • Rapid response
  • Emergency repairs
  • Minimal disruption to road users
sector-img2

For more information about this and other Route One projects,                      please call: 01977 799999

"Nothing was too much trouble, they gave assistance throughout"