Case Study: M1 J19

Client :
Location :
M1 J19
Date :
May 2015
Products :
Eliminator, SA1030 and Asphaltic Plug Joints (Thormajoint ST)

Route One are carrying out a large package of bridge works on six structures as part of a major scheme at Catthorpe Interchange.

The scheme will provide new links for M1, M6 and A14. The works include new expansion joints and waterproofing.

  • >40m lin of APJ completed within 4No shifts
  • >920m2 deck preparation (enclosed shot blasting)
  • One coat Eliminator waterproofing and SA1030 completed over 4No shifts
  • Drainage detail to T piece every metre and directed through air gap

For more information about this and other Route One projects call 01977 799999

"The work was done at very short notice and in a professional manner by the operatives on site."

J Richardson