Case Study: M62 Shillinghill

Client :
A-one+ Area 12
Location :
M62 Shillinghill
Date :
April 2015
Products :
Sentinel Rails, EMR 50 Seal, Sentinel Nosing Mortar, Metaset Flex Sealant, Aluminium Drainage, Safetrack HW, PAR 1 Primer, Rodding Boxes

Route One Highways were tasked by A-one+ to remove 8 existing Maurer Joints – 4 East Bound and 4 West Bound of the M62.

Route One utilised their fully trained burning and welding staff to remove the old joints before installing the new Stirling Lloyd EMR 50 joints to specification in replacement.

Rodding Boxes were also designed and installed to specification by Route One to allow for cleaning of the hydraulic pressure relief drainage.

  • Removal of Maurer Joints
  • Stirling Lloyd EMR 50 Joints
  • Rodding Boxes designed and installed to specification

For more information about this and other Route One projects,                      please call: 01977 799999

"Site Supervisor fantastic to work alongside."

P Horsfield

Find out how Route One can help with your project now. Call us on...

01977 799999