Case Studies

Client: EnterpriseMouchel Area 1 MAC

Location: A38 Old Exeter Road, Exeter

Date: February 2011

Products: Sentinel B Type 1

Sentinel Type 1 B20

Installation of Stirling Lloyds Type 1 B20 joint system. The system installed accommodates a horizontal movement range of 20mm. Approximately 40 linear metres of joints were replaced in conjunction with installing Eliminator ® waterproofing system. The works were carried out under a full road closure due to restricted working widths.