Case Studies

Client: City of Bradford Metropolitan District Council

Location: A658 Harrogate Road

Date: Feb 2011

Products: Maxicrete F

Maxicrete F

The two lane carriageway’s HRA mats were failing at the joint at depth of up to 40mm and widths up to 300mm. Maxicrete F joint repair was installed under day time lane closures totalling 900m Lin.