Case Studies

Client: Bardon Contracting Area 9 MAC

Location: M6 J13 River Penk

Date: April/May 2011

Products: Sentinel EMR 35

Mechanical bridge joints (Sentinel™ EMR) – Type 6

Installation of Stirling Lloyds Type 6 EMR35 joint system. The system installed accommodates a horizontal movement range of 35mm. Approximately 60 linear metres of joints were replaced during night time possessions.