Client: Aone+ Area 12
Location: M18 Greenland Lane
Date: July 2011
Products: Eliminator waterproofing
Spray applied bridge deck waterproofing (Eliminator®)
Installation of Stirling Lloyds Eliminator® spray applied waterproofing membrane. Approximately 750m2 of waterproofing was installed under full closure possessions. Route One Highways also undertook the bridge deck preparation and joint replacement work on this project.