Case Study: Fall Lane

Client :
AMCO
Location :
Fall Lane, Dewsbury
Date :
Christmas Day / Boxing Day 2014
Products :
One Coat Eliminator, Bituminous Boards, Mulseal DP Bituminous Latex Emulsion. Stirling Lloyd Hytec Sheet Membrane and Geo 1000

The works included installing bituminous emulsion to the sills (50m2).

Trims were then fitted along with one layer of Geo 1000 and Hytec sheet membrane (80m2). These works included laying out the Hytec and Geo 1000 once the bridge had been placed and heat welding the Hytec joints.

A second layer of Geo 1000 was then installed before the bituminous boards were installed to vertical faces on the bridge deck to protect the installed waterproofing.

sector-img1
  • Early contractor involvement on installation technique
  • Pre-installation carried out off-site
  • Works carried out Christmas Day/Boxing Day
  • Protection boards used for transportation to site
sector-img2

For more information about this and other Route One projects call 01977 799999

"Great team and very helpful. Finished ahead of Programme."

C Cowx