Case Study: M1 J19

Client :
Skanska
Location :
M1 J19
Date :
May 2015
Products :
Eliminator, SA1030 and Asphaltic Plug Joints (Thormajoint ST)

Route One are carrying out a large package of bridge works on six structures as part of a major scheme at Catthorpe Interchange.

The scheme will provide new links for M1, M6 and A14. The works include new expansion joints and waterproofing.

sector-img1
  • >40m lin of APJ completed within 4No shifts
  • >920m2 deck preparation (enclosed shot blasting)
  • One coat Eliminator waterproofing and SA1030 completed over 4No shifts
  • Drainage detail to T piece every metre and directed through air gap
sector-img2

For more information about this and other Route One projects call 01977 799999

"Crew worked well and safe throughout adverse conditions."