Case Study: M180 J1 to 3

Client :
Aone+
Location :
M180 J1 to 3
Date :
December 2012
Products :
Maxicrete Inlaid Crack Repair System

Route One installed over 5000m of Maxicrete between J1 and 3.

The existing carriageway consists of an existing concrete pavement, overlaid with between 20 and 40mm SMA that was showing signs of deterioration on the pavement mat joints and reflective cracking between the underlying concrete bays.

Problem area’s were mechanically planed out to depths between 40 and 120mm and Maxicrete F installed to finished surface level.

sector-img1
  • Early contractor involvement on installation technique, programme and material specification
  • 5000m installed over 15No Night Shifts
  • Rapid curing material for earlier possession times
  • BBA/HAPAS approved
sector-img2

For more information about this and other Route One projects call 01977 799999

"Very happy with Route One's service from price to reliability on site and final finished product."

K Griffin

Find out how Route One can help with your project now. Call us on...

01977 799999