Route One complete the Waterproofing and Concrete Repairs to Bedale Bypass.

46 Metaset Concrete Repairs were carried out at 50mm radius on the bridge deck before priming the deck, applying One Coat Eliminator and Tack Coat No.2.

The works were carried out over three visits on three different structures in conjunction with the new bypass for the relief of congestion through Leeming Barr.

sector-img1

• Three visits on three structures
• Stirling Lloyd Eliminator
• 46 Metaset Concrete Repairs
• Completed and passed x6 Pull-Off Tests

sector-img2

For more information about this and other Route One projects,                      please call: 01977 799999

"Works done ahead of programme."